da Vinci X/Xi Reprocessing

Universal Reprocessing & Prep and Pack steps for the following X/Xi device(s):

Endoscope for X/Xi Systems

Click on a step to view supplemental reprocessing information , or a video demonstration for selected steps:

9

4

Brush

Wrap or Prep

Brush submerged or under running cold water.

Wrap tray or prep container according to sterilization manufacturers’ instructions

10

5

Final Rinse

Sterilize

Rinse with critical water.

Sterilize using the Sterilization Process Parameters.

11

6

Final Decon Inspect

Store

Inspect entire endoscope for soil.

Store sterilized device in a clean, dry place.

12

Chemical Disinfection (optional)

Disinfect per hospital policy.

13

Transfer

Transfer the endoscope to prep and pack.

1

1

Dry

Drain water, dry all surfaces & blow air through ports.

2

3

2

Clean Connector Cover (if present)

Inspect

Final Inspection

Wipe thoroughly using disinfectant, dry, and attach cover.

Inspect entire endoscope for damage.

Inspect entire endoscope for soil and damage.

4

3

Prime

Prepare Solution

Pack

Prime button ports, input discs, and base with enzymatic solution.

Prepare enzymatic solution (pH 7-11).

Select tray or container, position device,and lock lid.

5

Soak

Soak endoscope and cable.

6

7

Rinse

Rinse under running cold water.

8

Spray

Flush

Submerge and spray gap and base.

Flush all ports with pressurized cold water.

2 x

6 x

Click on a step to view supplemental reprocessing information , or a video demonstration for selected steps:

Copyright © 2020  Intuitive Surgical.  All Rights Reserved.